|
The Primary Land Development
After finishing the land acquisition and resident removal, the
municipal infrastructure, the transportation system and the
landscape development have been completed. The municipal facilities
of Life Science Park consist of nine major systems and the land is
flattened finally. All pipelines end one meter into the property
line of each plot.
The ten major public utility systems
include the following:
A telecommunication system with 10K module
switcher;
A broadband network system;
A cable television system;
A medium pressure natural gas system;
A 110 KV two-way power supply system;
A municipal water supply system;
A municipal drainage system;
A municipal sewage pipeline system;
A computerised management system for the park
area;
A Transportation system
|