| Cost unit |
Source |
Measure
Method |
Criteria |
|
Note |
R&D
Building |
Production
Building |
Building Maintenance
Cost |
—— |
—— |
—— |
5.6 yuan/㎡•
month |
|
|
Energy cost |
| City water |
Municipal
Pipelines
Network |
Meter |
—— |
5.6yuan∕t |
|
Pretreatment
Water |
Internal
System |
Meter |
Suspended
solid 1㎎∕L—2㎎∕L
Residual Chlorine<0.1㎎∕L |
4.7 yuan∕m3 |
|
Technical
Steam |
Internal
System |
Meter |
8㎏ |
0.62 yuan∕m3 |
|
Air Conditioning
Cold Source |
Internal
System |
In accordance with
the area Meter |
3296kw |
1395kw |
50 yuan∕㎡ |
|
Air Conditioning
Heat Source |
Internal
System |
In accordance with
the area Meter |
2598kw |
1112kw |
70 yuan∕㎡ |
|
Intense
Power |
Network in the Park |
Meter |
—— |
0.7-0.8
yuan∕kw•h |
|
| Local telephone |
Telecommunication network |
—— |
—— |
—— |
The internet has been installed in each
part. The telecommunicat-ion office will determine it is
available or not and relevant cost. |
| Network |
Telecommunication network |
—— |
—— |
—— |