Feedback       Contact Us       Links       Site Map
Home | News | About the Park | Companies in the park | Investment | Incubator | Industry Guide | Service System | About us
  Entering Guidance | Modes of entering the Park | Procedure of Application | Services | Preferential Policies
Operation Cost of the R&D Building

Cost unit Source Measure
Method
Criteria   Note
R&D
Building
Production
Building
Building Maintenance
Cost
—— —— —— 5.6 yuan/㎡•
month
 

  Energy cost

City water Municipal
Pipelines
Network
Meter —— 5.6yuan∕t  
Pretreatment
Water
Internal
System
Meter Suspended solid 1㎎∕L—2㎎∕L
Residual Chlorine<0.1㎎∕L
4.7 yuan∕m3  
Technical
Steam
Internal
System
Meter 8㎏ 0.62 yuan∕m3  
Air Conditioning
Cold Source
Internal
System
In accordance with
the area Meter
3296kw 1395kw 50 yuan∕㎡  
Air Conditioning
Heat Source
Internal
System
In accordance with
the area Meter
2598kw 1112kw 70 yuan∕㎡  
Intense
Power
Network in the Park Meter —— 0.7-0.8
yuan∕kw•h
 
Local telephone Telecommunication network —— —— ——

The internet has been installed in each part. The telecommunicat-ion office will determine it is available or not and relevant cost.

Network Telecommunication network —— —— ——
Copyright 2003 ZGC Life Science Park Development Co., Ltd. All rights reserved. Design By Hetang Media